SK Developments Free home visit0800 088 6248 Get a quote

East SussexPlanning and building regulations

Planning and building regulations in Hove

We prepare planning and building regulations applications for homes in Hove and across East Sussex, from the measured survey to drawings ready for the council and building control.

Guide price in Hove

£750–£2,750 for application management (council fees extra)

In Hove, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a planning or building regulations application?

Surveyor measuring the rear of a brick semi-detached house with a laser measure

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.

How much does a planning or building regulations application cost in Hove?

In Hove, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Council application fees are extra.

Guide prices for Hove, including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)
Size or typeGuide range
Application management (council fees extra)£750–£2,750
Larger or more complex projects£2,750–£3,500

What moves the price most:

  • Party wall surveyor appointments
  • Planning conditions
  • Building control route
  • Council fees

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Planning and building regulations in Hove

Here is how the rules work for a planning or building regulations application in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

From survey to sign-off, the job normally involves:

  • Build-over agreements with the water company
  • Party wall notices
  • Planning or householder applications
  • Discharge of planning conditions
  • Building control application and inspections
  • Lawful development certificate applications

How long does it take?

Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Hove

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

If your home is in Hove or close by in Brighton, Portslade and Shoreham-by-Sea, a free home visit is the first step.

How it works

  1. 01

    Measured survey

    We visit and measure the house so the drawings start from accurate information.

  2. 02

    Design options

    Sketch layouts to agree the approach before detailed drawing starts.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Approval

    We follow the application through to a decision and pass on the approved drawings.

Questions about planning and building regulations applications in Hove

What is a lawful development certificate?

A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.

What happens if I build without approval?

The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.

Do you handle planning and building regulations applications in Hove?

Yes. We handle planning and building regulations applications across Hove, including postcodes BN3. Every project starts with a free home visit.

What is the difference between planning permission and building regulations?

Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.

How much does a planning or building regulations application cost in Hove?

In Hove, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.

Ready to talk about a planning or building regulations application in Hove? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price