What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Inverurie?
In Inverurie, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £55,500–£93,000. Prices in Scotland sit near the national average for this kind of work, and the range for Inverurie reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £39,000–£65,000 |
| Typical project (30 m²) | £55,500–£93,000 |
| Larger project (42 m²) | £77,500–£130,000 |
| Rate per m² | £1,850–£3,100 |
The biggest cost drivers are:
- Waterproofing system
- Ground water and access
- Agreements with neighbours on shared walls
- Existing cellar or new excavation
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a basement conversion in Inverurie?
Before anything is built in Inverurie, we confirm which approvals apply in Scotland. In Scotland converting an existing cellar may not need planning permission, but a building warrant is needed, and new excavation usually needs planning permission.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most basement conversions:
- Lightwells and windows
- Electrics, heating and plastering
- Underpinning or new structure where needed
- Waterproofing design (tanking or cavity drain membrane)
- Building control sign-off
- Insulation, ventilation and drainage pumps
How long does it take?
Expect 8 to 16 weeks for a cellar conversion; longer for new excavation. Allow time beforehand for drawings and approvals, usually 3 to 5 months.
Building in Inverurie
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Inverurie (AB51) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about basement conversions in Inverurie
Do you build basement conversions in Inverurie?
Yes. We build basement conversions across Inverurie, including postcodes AB51. Every project starts with a free home visit.
How much does a basement conversion cost in Inverurie?
In Inverurie, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £55,500–£93,000. Your fixed price depends on the survey and drawings.
How long does it take?
A cellar conversion takes around 8 to 16 weeks; new basements take longer.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
Do I need planning permission for a basement conversion in Inverurie?
In Scotland converting an existing cellar may not need planning permission, but a building warrant is needed, and new excavation usually needs planning permission.
