What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Manchester?
In Manchester, a basement conversion typically costs £1,800–£3,000 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £54,000–£90,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Manchester. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £38,000–£63,000 |
| Typical project (30 m²) | £54,000–£90,000 |
| Larger project (42 m²) | £75,500–£126,000 |
| Rate per m² | £1,800–£3,000 |
The biggest cost drivers are:
- Ground water and access
- Floor lowering and underpinning
- Existing cellar or new excavation
- Party wall surveyor fees
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a basement conversion in Manchester?
The approval route for Manchester is set by planning law in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a basement conversion:
- Underpinning or new structure where needed
- Insulation, ventilation and drainage pumps
- Building control sign-off
- Lightwells and windows
- Electrics, heating and plastering
- Party wall notices
How long does it take?
Expect 8 to 16 weeks for a cellar conversion; longer for new excavation. Before that, surveys, drawings and approvals usually take 3 to 5 months, longer if the council asks for changes.
Building in Manchester
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
From M1 outwards, we take on projects throughout Manchester and the surrounding parts of Greater Manchester.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about basement conversions in Manchester
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
Can a basement be a bedroom?
Yes, with a suitable escape route such as a lightwell window or protected stair.
How much does a basement conversion cost in Manchester?
In Manchester, a basement conversion typically costs £1,800–£3,000 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £54,000–£90,000. Your fixed price depends on the survey and drawings.
How long does a basement conversion take in Manchester?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.