What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Manchester?
In Manchester, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. Building costs in the North West run about 6% below the UK average, and the figures for Manchester are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£107,000 |
| Typical project (90 m²) | £76,500–£153,000 |
| Larger project (126 m²) | £107,000–£214,000 |
| Rate per m² | £850–£1,700 |
The biggest cost drivers are:
- Whether you live in during the work
- Windows and doors
- Kitchens and bathrooms
- Finishes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Manchester?
The approval route for Manchester is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Structural repairs and damp treatment
- Rewiring and heating upgrades
- Condition survey and scope of works
- Kitchens and bathrooms
- Joinery, doors and floors
- Plastering and boarding
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Manchester
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
We work across Manchester and neighbouring areas such as Salford, Failsworth and Droylsden. Postcodes we cover in Manchester include M1, M2, M3 and M4.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Manchester
How much does a house renovation cost in Manchester?
In Manchester, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How long does a house renovation take in Manchester?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.