What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Newtownards?
In Newtownards, a basement conversion typically costs £1,650–£2,750 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £49,500–£82,500. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £34,500–£58,000 |
| Typical project (30 m²) | £49,500–£82,500 |
| Larger project (42 m²) | £69,500–£115,500 |
| Rate per m² | £1,650–£2,750 |
What moves the price most:
- Existing cellar or new excavation
- Ground water and access
- Agreements with neighbours on shared walls
- Waterproofing system
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a basement conversion in Newtownards?
Before anything is built in Newtownards, we confirm which approvals apply in Northern Ireland. In Northern Ireland converting an existing cellar usually does not need planning permission; new excavation and external changes may.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Lightwells and windows
- Written agreement with neighbours on shared walls
- Insulation, ventilation and drainage pumps
- Electrics, heating and plastering
- Building control sign-off
- Waterproofing design (tanking or cavity drain membrane)
How long does it take?
The build itself usually takes 8 to 16 weeks for a cellar conversion; longer for new excavation. Before that, surveys, drawings and approvals usually take 3 to 5 months, longer if the council asks for changes.
Building in Newtownards
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
If your home is in Newtownards or close by in Bangor, Belfast and Carrickfergus, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about basement conversions in Newtownards
Do you build basement conversions in Newtownards?
Yes. We build basement conversions across Newtownards, including postcodes BT22 and BT23. Every project starts with a free home visit.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
How much does a basement conversion cost in Newtownards?
In Newtownards, a basement conversion typically costs £1,650–£2,750 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £49,500–£82,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a basement conversion in Newtownards?
In Northern Ireland converting an existing cellar usually does not need planning permission; new excavation and external changes may.
Can a basement be a bedroom?
Yes, with a suitable escape route such as a lightwell window or protected stair.
How long does it take?
A cellar conversion takes around 8 to 16 weeks; new basements take longer.