What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Wallington?
In Wallington, a basement conversion typically costs £2,450–£4,150 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £73,500–£124,500. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £51,500–£87,000 |
| Typical project (30 m²) | £73,500–£124,500 |
| Larger project (42 m²) | £103,000–£174,500 |
| Rate per m² | £2,450–£4,150 |
Your quote will depend mainly on:
- Waterproofing system
- Party wall surveyor fees
- Lightwells
- Ground water and access
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a basement conversion in Wallington?
Before anything is built in Wallington, we confirm which approvals apply in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a basement conversion:
- Electrics, heating and plastering
- Lightwells and windows
- Waterproofing design (tanking or cavity drain membrane)
- Insulation, ventilation and drainage pumps
- Party wall notices
- Structural and ground survey
How long does it take?
The build itself usually takes 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals come first and typically take 3 to 5 months, depending on the approval route.
Building in Wallington
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
From SM6 outwards, we take on projects throughout Wallington and the surrounding parts of Greater London.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about basement conversions in Wallington
How much does a basement conversion cost in Wallington?
In Wallington, a basement conversion typically costs £2,450–£4,150 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £73,500–£124,500. Your fixed price depends on the survey and drawings.
How long does a basement conversion take in Wallington?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
Does a basement conversion need planning permission?
Converting an existing cellar without changing the outside usually does not. New excavation, lightwells and changes visible from outside usually do.
