What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Wellington?
In Wellington, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £55,500–£93,000. Building costs in the West Midlands are close to the UK average, so the figures for Wellington are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £39,000–£65,000 |
| Typical project (30 m²) | £55,500–£93,000 |
| Larger project (42 m²) | £77,500–£130,000 |
| Rate per m² | £1,850–£3,100 |
The biggest cost drivers are:
- Party wall surveyor fees
- Ground water and access
- Existing cellar or new excavation
- Waterproofing system
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a basement conversion in Wellington?
The approval route for Wellington is set by planning law in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Lightwells and windows
- Underpinning or new structure where needed
- Insulation, ventilation and drainage pumps
- Building control sign-off
- Structural and ground survey
- Party wall notices
How long does it take?
The build itself usually takes 8 to 16 weeks for a cellar conversion; longer for new excavation. Before that, surveys, drawings and approvals usually take 3 to 5 months, longer if the council asks for changes.
Building in Wellington
The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.
From TF1 outwards, we take on projects throughout Wellington and the surrounding parts of Shropshire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about basement conversions in Wellington
How much does a basement conversion cost in Wellington?
In Wellington, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £55,500–£93,000. Your fixed price depends on the survey and drawings.
Do I need party wall agreements?
In England and Wales, excavating near a neighbour’s foundations usually triggers the Party Wall etc. Act 1996.
Does a basement conversion need planning permission?
Converting an existing cellar without changing the outside usually does not. New excavation, lightwells and changes visible from outside usually do.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
How long does a basement conversion take in Wellington?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.