What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Cirencester?
In Cirencester, a dormer loft conversion typically costs £49,000–£69,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Prices in the South West sit near the national average for this kind of work, and the range for Cirencester reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £49,000–£69,500 |
| Higher specification | £69,500–£87,000 |
The biggest cost drivers are:
- Fire safety upgrades to the existing house
- Built-in storage and finishes
- Dormer size and roof structure
- En-suite or bathroom
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a dormer loft conversion in Cirencester?
Here is how the rules work for a dormer loft conversion in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- New staircase and fire-safe escape route
- Party wall notices for shared walls
- Measured survey and head-height check
- Building control completion certificate
- Insulation, plastering, electrics and plumbing
- Dormer structure, roof covering and windows
How long does it take?
Build time is typically 6 to 9 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Cirencester
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Our Cirencester coverage includes postcode districts GL7, and we also work in nearby places such as Stroud, Cheltenham and Swindon.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about dormer loft conversions in Cirencester
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
Do I need a party wall agreement?
In England and Wales, if the conversion cuts into or builds on a shared wall, notices must be served under the Party Wall etc. Act 1996.
How long does a dormer loft conversion take in Cirencester?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a dormer loft conversion cost in Cirencester?
In Cirencester, a dormer loft conversion typically costs £49,000–£69,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
