What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Cirencester?
In Cirencester, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000. Prices in the South West sit near the national average for this kind of work, and the range for Cirencester reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £42,500–£64,000 |
| Typical project (36 m²) | £61,000–£92,000 |
| Larger project (50 m²) | £85,000–£127,500 |
| Rate per m² | £1,700–£2,550 |
The biggest cost drivers are:
- Scaffolding and access to the rear
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Cirencester?
Approvals for a double-storey extension in Cirencester follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Foundations, drainage and scaffolding
- Windows, doors and staircase alterations
- Brick or block walls, floors and a roof tied into the house
- Design drawings and planning application
- Building control sign-off
- Opening up at both levels with steel beams
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Cirencester
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Cirencester sits in Gloucestershire, about 15 miles south-east of Gloucester. We cover the whole of Cirencester, including postcodes GL7.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Cirencester
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How long does a double-storey extension take in Cirencester?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
How much does a double-storey extension cost in Cirencester?
In Cirencester, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £61,000–£92,000. Your fixed price depends on the survey and drawings.