SK Developments Free home visit0800 088 6248 Get a quote

Dumfries and GallowayDouble-storey extensions

Double-storey extensions in Annan

Looking for a builder for a double-storey extension in Annan? We design and build double-storey extensions across Dumfries and Galloway, covering postcodes such as DG12.

Guide price in Annan

£1,600–£2,400 per m² of floor area (both floors)

In Annan, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Annan?

In Annan, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Prices in Scotland sit near the national average for this kind of work, and the range for Annan reflects that. Design, structural calculations and council fees are extra.

Guide prices for Annan, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£40,000–£60,000
Typical project (36 m²)£57,500–£86,500
Larger project (50 m²)£80,000–£120,000
Rate per m²£1,600–£2,400

The biggest cost drivers are:

  • Steel beams where walls are opened up
  • Bathrooms or en-suites on the first floor
  • Roof design and how it joins the existing roof
  • Total floor area across both floors

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a double-storey extension in Annan?

The approval route for Annan is set by planning law in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

The work we manage on a double-storey extension:

  • Electrics, heating, plumbing and plastering
  • Brick or block walls, floors and a roof tied into the house
  • Design drawings and planning application
  • Structural engineer’s calculations
  • Foundations, drainage and scaffolding
  • Windows, doors and staircase alterations

How long does it take?

The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Annan

In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.

Projects in Annan (DG12) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about double-storey extensions in Annan

Will the first floor need a new staircase?

Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.

Do I need planning permission for a double-storey extension in Annan?

In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

How long does a double-storey extension take in Annan?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

How much does a double-storey extension cost in Annan?

In Annan, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.

How close can it be to my neighbour?

Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.

Can I live at home during the work?

Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.

Tell us about your project in Annan and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price