Double-storey extensions in Selkirk

Thinking about a double-storey extension in Selkirk? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Selkirk

£1,600–£2,400 per m² of floor area (both floors)

In Selkirk, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Selkirk?

In Selkirk, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Building costs in Scotland are close to the UK average, so the figures for Selkirk are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Selkirk, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£40,000–£60,000
Typical project (36 m²)£57,500–£86,500
Larger project (50 m²)£80,000–£120,000
Rate per m²£1,600–£2,400

Your quote will depend mainly on:

  • Bathrooms or en-suites on the first floor
  • Total floor area across both floors
  • Steel beams where walls are opened up
  • Brick matching and external finishes

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a double-storey extension in Selkirk?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

What we take care of:

  • Opening up at both levels with steel beams
  • Foundations, drainage and scaffolding
  • Windows, doors and staircase alterations
  • Design drawings and planning application
  • Brick or block walls, floors and a roof tied into the house
  • Structural engineer’s calculations

How long does it take?

Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Selkirk

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Selkirk sits in the Scottish Borders, about 5 miles south of Galashiels. We cover the whole of Selkirk, including postcodes TD7.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in Selkirk

Is a double-storey extension cheaper per square metre?

Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.

How much does a double-storey extension cost in Selkirk?

In Selkirk, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.

Will the first floor need a new staircase?

Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.

How close can it be to my neighbour?

Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.

Do I need planning permission for a double-storey extension in Selkirk?

In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

How long does a double-storey extension take in Selkirk?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

Tell us about your project in Selkirk and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.