What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Bebington?
In Bebington, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£84,500. Building costs in the North West run about 6% below the UK average, and the figures for Bebington are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£59,000 |
| Typical project (36 m²) | £56,000–£84,500 |
| Larger project (50 m²) | £77,500–£117,500 |
| Rate per m² | £1,550–£2,350 |
What moves the price most:
- Roof design and how it joins the existing roof
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
- Brick matching and external finishes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a double-storey extension in Bebington?
Before anything is built in Bebington, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Structural engineer’s calculations
- Design drawings and planning application
- Brick or block walls, floors and a roof tied into the house
- Opening up at both levels with steel beams
- Electrics, heating, plumbing and plastering
- Windows, doors and staircase alterations
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Bebington
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
We work across Bebington and neighbouring areas such as Birkenhead, Heswall and Liverpool. Postcodes we cover in Bebington include CH32 and CH63.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Bebington
How much does a double-storey extension cost in Bebington?
In Bebington, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£84,500. Your fixed price depends on the survey and drawings.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
How long does a double-storey extension take in Bebington?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.