What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Chichester?
In Chichester, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £66,500–£101,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Chichester. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £46,000–£70,000 |
| Typical project (36 m²) | £66,500–£101,000 |
| Larger project (50 m²) | £92,500–£140,000 |
| Rate per m² | £1,850–£2,800 |
What moves the price most:
- Brick matching and external finishes
- Total floor area across both floors
- Scaffolding and access to the rear
- Roof design and how it joins the existing roof
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Chichester?
Before anything is built in Chichester, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical double-storey extension we handle:
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
- Opening up at both levels with steel beams
- Building control sign-off
- Windows, doors and staircase alterations
- Structural engineer’s calculations
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Chichester
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
If your home is in Chichester or close by in Bognor Regis, Emsworth and Havant, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Chichester
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How much does a double-storey extension cost in Chichester?
In Chichester, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £66,500–£101,000. Your fixed price depends on the survey and drawings.
How long does a double-storey extension take in Chichester?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.