What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Chichester?
In Chichester, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £53,000–£82,500. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Chichester. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £38,000–£59,000 |
| Typical project (28 m²) | £53,000–£82,500 |
| Larger project (39 m²) | £74,000–£115,000 |
| Rate per m² | £1,900–£2,950 |
What moves the price most:
- Internal fit-out of the new rooms
- Boundary walls and access for materials
- Steel work where the side wall is opened
- Roof design and tile matching
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Chichester?
The approval route for Chichester is set by planning law in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most side extensions:
- Structural calculations
- Building control completion
- Survey of the boundary, drains and access
- Planning drawings and application
- Opening into the existing house
- Walls, roof and windows to match the house
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Chichester
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
If your home is in Chichester or close by in Bognor Regis, Emsworth and Havant, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Chichester
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How much does a side extension cost in Chichester?
In Chichester, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £53,000–£82,500. Your fixed price depends on the survey and drawings.
Who approves a side extension in Chichester?
Planning matters in Chichester go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.