What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in County Fermanagh?
In County Fermanagh, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £50,500–£77,500. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £35,000–£54,000 |
| Typical project (36 m²) | £50,500–£77,500 |
| Larger project (50 m²) | £70,000–£107,500 |
| Rate per m² | £1,400–£2,150 |
Your quote will depend mainly on:
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in County Fermanagh?
The approval route for County Fermanagh is set by planning law in Northern Ireland. In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
- Structural engineer’s calculations
- Electrics, heating, plumbing and plastering
- Design drawings and planning application
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in County Fermanagh
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
Towns we cover in County Fermanagh include Enniskillen.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in County Fermanagh
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How much does a double-storey extension cost in County Fermanagh?
In County Fermanagh, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £50,500–£77,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a double-storey extension in County Fermanagh?
In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How long does a double-storey extension take in County Fermanagh?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.