SK Developments Free home visit0800 088 6248 Get a quote

Northern IrelandDouble-storey extensions

Double-storey extensions in County Tyrone

SK Developments designs and builds double-storey extensions across County Tyrone, including Omagh, Strabane and Dungannon. One contract covers the drawings, approvals and the build.

Guide price in County Tyrone

£1,400–£2,150 per m² of floor area (both floors)

In County Tyrone, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £50,500–£77,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in County Tyrone?

In County Tyrone, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £50,500–£77,500. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.

Guide prices for County Tyrone, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£35,000–£54,000
Typical project (36 m²)£50,500–£77,500
Larger project (50 m²)£70,000–£107,500
Rate per m²£1,400–£2,150

The biggest cost drivers are:

  • Scaffolding and access to the rear
  • Total floor area across both floors
  • Steel beams where walls are opened up
  • Roof design and how it joins the existing roof

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a double-storey extension in County Tyrone?

Whether you need planning permission depends on your house and its location in Northern Ireland. In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.

In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Design drawings and planning application
  • Opening up at both levels with steel beams
  • Electrics, heating, plumbing and plastering
  • Windows, doors and staircase alterations
  • Structural engineer’s calculations
  • Building control sign-off

How long does it take?

Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in County Tyrone

Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.

Towns we cover in County Tyrone include Omagh, Strabane, Dungannon and Cookstown.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in County Tyrone

Is a double-storey extension cheaper per square metre?

Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.

Do I need planning permission for a double-storey extension in County Tyrone?

In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.

How much does a double-storey extension cost in County Tyrone?

In County Tyrone, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £50,500–£77,500. Your fixed price depends on the survey and drawings.

Can I live at home during the work?

Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.

How long does a double-storey extension take in County Tyrone?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

What drawings do I need?

Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.

Tell us about your project in County Tyrone and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price