What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in County Tyrone?
In County Tyrone, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £24,000–£34,000. Building costs in Northern Ireland run about 14% below the UK average, and the figures for County Tyrone are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £16,000–£23,000 |
| Typical project (12 m²) | £24,000–£34,000 |
| Larger project (17 m²) | £34,000–£48,500 |
| Rate per m² | £2,000–£2,850 |
Your quote will depend mainly on:
- Access through the house for materials
- Steel beams and propping of the back addition
- Agreements with neighbours on shared walls
- Length of the side return
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side return extension in County Tyrone?
The approval route for County Tyrone is set by planning law in Northern Ireland. In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical side return extension we handle:
- Building control sign-off
- Floor levelling, heating and electrics
- Drawings and planning or permitted development check
- Glazed or solid roof with insulation
- Written agreement with neighbours on shared walls
- Written agreement with neighbours on shared walls
How long does it take?
Build time is typically 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in County Tyrone
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
Towns we cover in County Tyrone include Omagh, Strabane, Dungannon and Cookstown.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in County Tyrone
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How much does a side return extension cost in County Tyrone?
In County Tyrone, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £24,000–£34,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a side return extension in County Tyrone?
In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
How long does a side return extension take in County Tyrone?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
