What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Derry?
In Derry, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £50,500–£77,500. Building costs in Northern Ireland run about 14% below the UK average, and the figures for Derry are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £35,000–£54,000 |
| Typical project (36 m²) | £50,500–£77,500 |
| Larger project (50 m²) | £70,000–£107,500 |
| Rate per m² | £1,400–£2,150 |
Your quote will depend mainly on:
- Brick matching and external finishes
- Roof design and how it joins the existing roof
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a double-storey extension in Derry?
The approval route for Derry is set by planning law in Northern Ireland. In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a double-storey extension:
- Building control sign-off
- Foundations, drainage and scaffolding
- Electrics, heating, plumbing and plastering
- Design drawings and planning application
- Structural engineer’s calculations
- Windows, doors and staircase alterations
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Derry
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT47 outwards, we take on projects throughout Derry and the surrounding parts of County Londonderry.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Derry
Do you build double-storey extensions in Derry?
Yes. We build double-storey extensions across Derry, including postcodes BT47. Every project starts with a free home visit.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How much does a double-storey extension cost in Derry?
In Derry, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £50,500–£77,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a double-storey extension in Derry?
In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.