What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Droylsden?
In Droylsden, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£84,500. Building costs in the North West run about 6% below the UK average, and the figures for Droylsden are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£59,000 |
| Typical project (36 m²) | £56,000–£84,500 |
| Larger project (50 m²) | £77,500–£117,500 |
| Rate per m² | £1,550–£2,350 |
The main things that change the cost:
- Roof design and how it joins the existing roof
- Scaffolding and access to the rear
- Steel beams where walls are opened up
- Total floor area across both floors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Droylsden?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most double-storey extensions:
- Brick or block walls, floors and a roof tied into the house
- Opening up at both levels with steel beams
- Building control sign-off
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
- Structural engineer’s calculations
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Droylsden
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Droylsden sits in Greater Manchester, about 4 miles east of Manchester. We cover the whole of Droylsden, including postcodes M43.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Droylsden
How long does a double-storey extension take in Droylsden?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How much does a double-storey extension cost in Droylsden?
In Droylsden, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£84,500. Your fixed price depends on the survey and drawings.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
