Double-storey extensions in Edinburgh

SK Developments designs and builds double-storey extensions across Edinburgh. One contract covers the drawings, approvals and the build.

Guide price in Edinburgh

£1,600–£2,400 per m² of floor area (both floors)

In Edinburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Edinburgh?

In Edinburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Building costs in Scotland are close to the UK average, so the figures for Edinburgh are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Edinburgh, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£40,000–£60,000
Typical project (36 m²)£57,500–£86,500
Larger project (50 m²)£80,000–£120,000
Rate per m²£1,600–£2,400

The biggest cost drivers are:

  • Brick matching and external finishes
  • Roof design and how it joins the existing roof
  • Bathrooms or en-suites on the first floor
  • Steel beams where walls are opened up

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a double-storey extension in Edinburgh?

Here is how the rules work for a double-storey extension in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

We check this for your address before design work starts, so there are no surprises later.

What we handle

From survey to sign-off, the job normally involves:

  • Brick or block walls, floors and a roof tied into the house
  • Design drawings and planning application
  • Structural engineer’s calculations
  • Electrics, heating, plumbing and plastering
  • Foundations, drainage and scaffolding
  • Windows, doors and staircase alterations

How long does it take?

The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Edinburgh

In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.

We cover the whole of Edinburgh.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in Edinburgh

How long does a double-storey extension take in Edinburgh?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

Will the first floor need a new staircase?

Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.

Is a double-storey extension cheaper per square metre?

Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.

How much does a double-storey extension cost in Edinburgh?

In Edinburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.

How close can it be to my neighbour?

Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.

Do I need planning permission for a double-storey extension in Edinburgh?

In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

Ready to talk about a double-storey extension in Edinburgh? Book a free home visit or get an instant guide price.