What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Edinburgh?
In Edinburgh, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Building costs in Scotland are close to the UK average, so the figures for Edinburgh are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
The main things that change the cost:
- Access through the house for materials
- Glazed roof specification
- Agreements with neighbours on shared walls
- Moving drains and soil stacks
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side return extension in Edinburgh?
Here is how the rules work for a side return extension in Scotland. In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most side return extensions:
- Steel beams to remove the side wall
- Building control sign-off
- Glazed or solid roof with insulation
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
- Floor levelling, heating and electrics
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Edinburgh
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
We cover the whole of Edinburgh.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Edinburgh
Do I need planning permission for a side return extension in Edinburgh?
In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How long does a side return extension take in Edinburgh?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a side return extension cost in Edinburgh?
In Edinburgh, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.