What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Haverhill?
In Haverhill, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £63,000–£95,500. The guide for Haverhill reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £44,000–£66,000 |
| Typical project (36 m²) | £63,000–£95,500 |
| Larger project (50 m²) | £87,500–£132,500 |
| Rate per m² | £1,750–£2,650 |
What moves the price most:
- Scaffolding and access to the rear
- Roof design and how it joins the existing roof
- Steel beams where walls are opened up
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Haverhill?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Building control sign-off
- Brick or block walls, floors and a roof tied into the house
- Opening up at both levels with steel beams
- Structural engineer’s calculations
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Haverhill
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
From CB9 outwards, we take on projects throughout Haverhill and the surrounding parts of Suffolk.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Haverhill
Who approves a double-storey extension in Haverhill?
Planning matters in Haverhill go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a double-storey extension cost in Haverhill?
In Haverhill, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £63,000–£95,500. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.