What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Suffolk?
In Suffolk, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £63,000–£95,500. The guide for Suffolk reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £44,000–£66,000 |
| Typical project (36 m²) | £63,000–£95,500 |
| Larger project (50 m²) | £87,500–£132,500 |
| Rate per m² | £1,750–£2,650 |
The main things that change the cost:
- Total floor area across both floors
- Scaffolding and access to the rear
- Brick matching and external finishes
- Roof design and how it joins the existing roof
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a double-storey extension in Suffolk?
The approval route for Suffolk is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical double-storey extension we handle:
- Electrics, heating, plumbing and plastering
- Brick or block walls, floors and a roof tied into the house
- Building control sign-off
- Windows, doors and staircase alterations
- Opening up at both levels with steel beams
- Design drawings and planning application
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Suffolk
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Towns we cover in Suffolk include Ipswich, Lowestoft, Bury St Edmunds, Haverhill, Felixstowe and Sudbury.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Suffolk
How much does a double-storey extension cost in Suffolk?
In Suffolk, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £63,000–£95,500. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How long does a double-storey extension take in Suffolk?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.