What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Hove?
In Hove, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £66,500–£101,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £46,000–£70,000 |
| Typical project (36 m²) | £66,500–£101,000 |
| Larger project (50 m²) | £92,500–£140,000 |
| Rate per m² | £1,850–£2,800 |
The main things that change the cost:
- Roof design and how it joins the existing roof
- Steel beams where walls are opened up
- Bathrooms or en-suites on the first floor
- Total floor area across both floors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Hove?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical double-storey extension we handle:
- Structural engineer’s calculations
- Building control sign-off
- Foundations, drainage and scaffolding
- Design drawings and planning application
- Brick or block walls, floors and a roof tied into the house
- Electrics, heating, plumbing and plastering
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Hove
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
We work across Hove and neighbouring areas such as Brighton, Portslade and Shoreham-by-Sea. Postcodes we cover in Hove include BN3.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Hove
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How much does a double-storey extension cost in Hove?
In Hove, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £66,500–£101,000. Your fixed price depends on the survey and drawings.
Do you build double-storey extensions in Hove?
Yes. We build double-storey extensions across Hove, including postcodes BN3. Every project starts with a free home visit.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
