What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Kingston upon Thames?
In Kingston upon Thames, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £77,500–£117,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £54,000–£81,000 |
| Typical project (36 m²) | £77,500–£117,000 |
| Larger project (50 m²) | £107,500–£162,500 |
| Rate per m² | £2,150–£3,250 |
The biggest cost drivers are:
- Roof design and how it joins the existing roof
- Total floor area across both floors
- Scaffolding and access to the rear
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Kingston upon Thames?
Approvals for a double-storey extension in Kingston upon Thames follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Structural engineer’s calculations
- Building control sign-off
- Opening up at both levels with steel beams
- Brick or block walls, floors and a roof tied into the house
- Foundations, drainage and scaffolding
- Electrics, heating, plumbing and plastering
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Kingston upon Thames
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Projects in Kingston upon Thames (KT1 and TW10) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Kingston upon Thames
Do you build double-storey extensions in Kingston upon Thames?
Yes. We build double-storey extensions across Kingston upon Thames, including postcodes KT1 and TW10. Every project starts with a free home visit.
How much does a double-storey extension cost in Kingston upon Thames?
In Kingston upon Thames, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £77,500–£117,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.