What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Leyland?
In Leyland, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£84,500. We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£59,000 |
| Typical project (36 m²) | £56,000–£84,500 |
| Larger project (50 m²) | £77,500–£117,500 |
| Rate per m² | £1,550–£2,350 |
Your quote will depend mainly on:
- Scaffolding and access to the rear
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a double-storey extension in Leyland?
The approval route for Leyland is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
- Opening up at both levels with steel beams
- Building control sign-off
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Leyland
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Projects in Leyland (PR5, PR25 and PR26) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Leyland
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Who approves a double-storey extension in Leyland?
Planning matters in Leyland go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How much does a double-storey extension cost in Leyland?
In Leyland, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£84,500. Your fixed price depends on the survey and drawings.