What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Leyland?
In Leyland, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £37,000–£55,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Leyland. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,000–£38,500 |
| Typical project (20 m²) | £37,000–£55,000 |
| Larger project (28 m²) | £52,000–£77,000 |
| Rate per m² | £1,850–£2,750 |
The main things that change the cost:
- Roof type and the size of any lantern or roof windows
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- How much of the existing house is opened up
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Leyland?
The approval route for Leyland is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most single-storey extensions:
- First and second fix electrics, heating and plastering
- Doors, windows and roof glazing installed
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Knock-through to the existing house with steel beams
- Cavity walls, insulation and roof to current building regulations
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Leyland
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Leyland sits in Lancashire, about 4 miles south of Preston. We cover the whole of Leyland, including postcodes PR5, PR25 and PR26.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Leyland
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Leyland?
In Leyland, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £37,000–£55,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Leyland?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.