What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in North Watford?
In North Watford, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £63,000–£95,500. The guide for North Watford reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £44,000–£66,000 |
| Typical project (36 m²) | £63,000–£95,500 |
| Larger project (50 m²) | £87,500–£132,500 |
| Rate per m² | £1,750–£2,650 |
The biggest cost drivers are:
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
- Steel beams where walls are opened up
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in North Watford?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most double-storey extensions:
- Brick or block walls, floors and a roof tied into the house
- Design drawings and planning application
- Opening up at both levels with steel beams
- Windows, doors and staircase alterations
- Building control sign-off
- Structural engineer’s calculations
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in North Watford
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
If your home is in North Watford or close by in Watford, Bushey and Rickmansworth, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in North Watford
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How much does a double-storey extension cost in North Watford?
In North Watford, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £63,000–£95,500. Your fixed price depends on the survey and drawings.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Who approves a double-storey extension in North Watford?
Planning matters in North Watford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
