What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in North Watford?
In North Watford, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £41,000–£61,000. That range is adjusted for the East of England, where domestic building work typically costs around 6% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £28,500–£42,500 |
| Typical project (20 m²) | £41,000–£61,000 |
| Larger project (28 m²) | £57,500–£85,500 |
| Rate per m² | £2,050–£3,050 |
The biggest cost drivers are:
- Ground conditions and foundation depth
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Kitchen, flooring and finishes, which we can include or leave to you
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in North Watford?
Here is how the rules work for a single-storey extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical single-storey extension we handle:
- Building control inspections and completion certificate
- Structural calculations for steels and lintels
- Measured survey and design drawings
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Knock-through to the existing house with steel beams
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in North Watford
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
From WD1 outwards, we take on projects throughout North Watford and the surrounding parts of Hertfordshire.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in North Watford
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How much does a single-storey extension cost in North Watford?
In North Watford, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £41,000–£61,000. Your fixed price depends on the survey and drawings.
Who approves a single-storey extension in North Watford?
Planning matters in North Watford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
