What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Northolt?
In Northolt, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £77,500–£117,000. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £54,000–£81,000 |
| Typical project (36 m²) | £77,500–£117,000 |
| Larger project (50 m²) | £107,500–£162,500 |
| Rate per m² | £2,150–£3,250 |
Your quote will depend mainly on:
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
- Total floor area across both floors
- Steel beams where walls are opened up
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a double-storey extension in Northolt?
The approval route for Northolt is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a double-storey extension:
- Design drawings and planning application
- Building control sign-off
- Opening up at both levels with steel beams
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
- Brick or block walls, floors and a roof tied into the house
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Northolt
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Our Northolt coverage includes postcode districts UB5, and we also work in nearby places such as Greenford, Harrow and Southall.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Northolt
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How much does a double-storey extension cost in Northolt?
In Northolt, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £77,500–£117,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How long does a double-storey extension take in Northolt?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.