What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Southall?
In Southall, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £77,500–£117,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £54,000–£81,000 |
| Typical project (36 m²) | £77,500–£117,000 |
| Larger project (50 m²) | £107,500–£162,500 |
| Rate per m² | £2,150–£3,250 |
Your quote will depend mainly on:
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
- Brick matching and external finishes
- Total floor area across both floors
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a double-storey extension in Southall?
Approvals for a double-storey extension in Southall follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Electrics, heating, plumbing and plastering
- Opening up at both levels with steel beams
- Windows, doors and staircase alterations
- Brick or block walls, floors and a roof tied into the house
- Design drawings and planning application
- Building control sign-off
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Southall
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Projects in Southall (UB1) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Southall
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How much does a double-storey extension cost in Southall?
In Southall, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £77,500–£117,000. Your fixed price depends on the survey and drawings.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Who approves a double-storey extension in Southall?
Planning matters in Southall go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.