What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Nottinghamshire?
In Nottinghamshire, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£86,500. That range is adjusted for the East Midlands, where domestic building work typically costs around 5% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£60,000 |
| Typical project (36 m²) | £56,000–£86,500 |
| Larger project (50 m²) | £77,500–£120,000 |
| Rate per m² | £1,550–£2,400 |
The biggest cost drivers are:
- Steel beams where walls are opened up
- Roof design and how it joins the existing roof
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Nottinghamshire?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a double-storey extension:
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
- Windows, doors and staircase alterations
- Brick or block walls, floors and a roof tied into the house
- Foundations, drainage and scaffolding
- Building control sign-off
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Nottinghamshire
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Towns we cover in Nottinghamshire include Nottingham, Mansfield, Worksop, Newark on Trent, Arnold and West Bridgford.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Nottinghamshire
How much does a double-storey extension cost in Nottinghamshire?
In Nottinghamshire, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£86,500. Your fixed price depends on the survey and drawings.
Do you build double-storey extensions in Nottinghamshire?
Yes. We build double-storey extensions across Nottinghamshire, including postcodes DN10, DN11, DN21, DN22 and LE12. Every project starts with a free home visit.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.