What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in West Bridgford?
In West Bridgford, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£86,500. The guide for West Bridgford reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£60,000 |
| Typical project (36 m²) | £56,000–£86,500 |
| Larger project (50 m²) | £77,500–£120,000 |
| Rate per m² | £1,550–£2,400 |
The biggest cost drivers are:
- Roof design and how it joins the existing roof
- Total floor area across both floors
- Scaffolding and access to the rear
- Steel beams where walls are opened up
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in West Bridgford?
Before anything is built in West Bridgford, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Structural engineer’s calculations
- Foundations, drainage and scaffolding
- Building control sign-off
- Windows, doors and staircase alterations
- Opening up at both levels with steel beams
- Design drawings and planning application
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in West Bridgford
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Projects in West Bridgford (NG2) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in West Bridgford
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How much does a double-storey extension cost in West Bridgford?
In West Bridgford, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£86,500. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Who approves a double-storey extension in West Bridgford?
Planning matters in West Bridgford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.