What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Salisbury?
In Salisbury, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000. Prices in the South West sit near the national average for this kind of work, and the range for Salisbury reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £42,500–£64,000 |
| Typical project (36 m²) | £61,000–£92,000 |
| Larger project (50 m²) | £85,000–£127,500 |
| Rate per m² | £1,700–£2,550 |
Your quote will depend mainly on:
- Steel beams where walls are opened up
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Salisbury?
Whether you need planning permission depends on your house and its location in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical double-storey extension we handle:
- Windows, doors and staircase alterations
- Opening up at both levels with steel beams
- Structural engineer’s calculations
- Foundations, drainage and scaffolding
- Electrics, heating, plumbing and plastering
- Design drawings and planning application
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Salisbury
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Projects in Salisbury (SP1) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Salisbury
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How much does a double-storey extension cost in Salisbury?
In Salisbury, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £61,000–£92,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How long does a double-storey extension take in Salisbury?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.