What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Winchester?
In Winchester, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £66,500–£101,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £46,000–£70,000 |
| Typical project (36 m²) | £66,500–£101,000 |
| Larger project (50 m²) | £92,500–£140,000 |
| Rate per m² | £1,850–£2,800 |
What moves the price most:
- Roof design and how it joins the existing roof
- Scaffolding and access to the rear
- Steel beams where walls are opened up
- Total floor area across both floors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Winchester?
Before anything is built in Winchester, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Opening up at both levels with steel beams
- Brick or block walls, floors and a roof tied into the house
- Design drawings and planning application
- Building control sign-off
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Winchester
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Projects in Winchester (SO23 and SO25) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Winchester
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How much does a double-storey extension cost in Winchester?
In Winchester, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £66,500–£101,000. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
Do you build double-storey extensions in Winchester?
Yes. We build double-storey extensions across Winchester, including postcodes SO23 and SO25. Every project starts with a free home visit.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.