SK Developments Free home visit0800 088 6248 Get a quote

DorsetDouble-storey extensions

Double-storey extensions in Weymouth

Thinking about a double-storey extension in Weymouth? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Weymouth

£1,700–£2,550 per m² of floor area (both floors)

In Weymouth, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Weymouth?

In Weymouth, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000. Building costs in the South West are close to the UK average, so the figures for Weymouth are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Weymouth, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£42,500–£64,000
Typical project (36 m²)£61,000–£92,000
Larger project (50 m²)£85,000–£127,500
Rate per m²£1,700–£2,550

Your quote will depend mainly on:

  • Roof design and how it joins the existing roof
  • Steel beams where walls are opened up
  • Total floor area across both floors
  • Scaffolding and access to the rear

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a double-storey extension in Weymouth?

The approval route for Weymouth is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

From survey to sign-off, the job normally involves:

  • Design drawings and planning application
  • Electrics, heating, plumbing and plastering
  • Windows, doors and staircase alterations
  • Building control sign-off
  • Opening up at both levels with steel beams
  • Foundations, drainage and scaffolding

How long does it take?

Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Weymouth

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

Projects in Weymouth (DT3 and DT4) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in Weymouth

Is a double-storey extension cheaper per square metre?

Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.

What drawings do I need?

Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.

Can I live at home during the work?

Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.

How much does a double-storey extension cost in Weymouth?

In Weymouth, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £61,000–£92,000. Your fixed price depends on the survey and drawings.

How long does a double-storey extension take in Weymouth?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

Ready to talk about a double-storey extension in Weymouth? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price