What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Kent?
In Kent, a glazed extension typically costs £3,150–£4,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £56,500–£84,500. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £41,000–£61,000 |
| Typical project (18 m²) | £56,500–£84,500 |
| Larger project (25 m²) | £79,000–£117,500 |
| Rate per m² | £3,150–£4,700 |
Your quote will depend mainly on:
- Lighting and finishes
- Access for large glass panels
- Steel framing
- Overheating and energy design
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a glazed extension in Kent?
Here is how the rules work for a glazed extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most glazed extensions:
- Cladding or render finish
- Electrics, heating and finishes
- Structural design for steel frames and glass supports
- Building control sign-off
- Energy and overheating calculations where needed
- Foundations, walls and insulated roof
How long does it take?
Expect 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Kent
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Towns we cover in Kent include St Peters, Maidstone, Gillingham, Chatham, Tunbridge Wells and Folkestone.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about glazed extensions in Kent
Can large glass panels be lifted in?
Some need a crane or glass-lifting robot. We plan access during design.
How much does a glazed extension cost in Kent?
In Kent, a glazed extension typically costs £3,150–£4,700 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £56,500–£84,500. Your fixed price depends on the survey and drawings.
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
Does it need planning permission?
The same rules as other extensions apply, but contemporary designs in conservation areas are assessed carefully. We discuss the design approach with you before applying.
How long does a glazed extension take in Kent?
Typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Design and approvals beforehand usually take 3 to 4 months.