What is a hip-to-gable loft conversion?

A hip-to-gable loft conversion replaces the sloping side (the hip) of a semi-detached or detached roof with a vertical gable wall. This extends the ridge and creates enough space for a staircase and a full-size room, usually combined with a rear dormer.
How much does a hip-to-gable loft conversion cost in Christchurch?
In Christchurch, a hip-to-gable loft conversion typically costs £56,000–£79,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Building costs in the South West are close to the UK average, so the figures for Christchurch are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A hip-to-gable with rear dormer | £56,000–£79,500 |
| Higher specification | £79,500–£99,500 |
The main things that change the cost:
- Scaffolding to three sides
- Roof tile matching
- Bathroom and plumbing
- Staircase design
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a hip-to-gable loft conversion in Christchurch?
Here is how the rules work for a hip-to-gable loft conversion in England. In England a hip-to-gable conversion is often permitted development within the 50 cubic metre roof volume limit for semi-detached and detached houses, provided the gable does not face a road and the house is not in a conservation area.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most hip-to-gable loft conversions:
- Drawings and structural calculations
- Gable wall built in brick or block and finished to match
- Survey and planning check
- Insulation, electrics, plumbing and plastering
- Building control sign-off
- Steel beams and floor joists
How long does it take?
The build itself usually takes 7 to 10 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Christchurch
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
We work across Christchurch and neighbouring areas such as Bournemouth, New Milton and Poole. Postcodes we cover in Christchurch include BH23.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about hip-to-gable loft conversions in Christchurch
Is a hip-to-gable better than a dormer?
On a hipped roof, a dormer alone often leaves too little space for stairs. Combining hip-to-gable with a rear dormer gives the most room.
How much does a hip-to-gable loft conversion cost in Christchurch?
In Christchurch, a hip-to-gable loft conversion typically costs £56,000–£79,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Is a hip-to-gable conversion permitted development?
Often yes in England, within the 50 cubic metre roof volume limit for semi-detached and detached houses. It is not permitted development in conservation areas or where rights have been removed.
Can the gable be brick?
Yes. We match the existing finish, whether brick, render or pebbledash.
How long does a hip-to-gable loft conversion take in Christchurch?
Typically 7 to 10 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
