What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Ashford, Kent?
In Ashford, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £90,000–£180,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £63,000–£126,000 |
| Typical project (90 m²) | £90,000–£180,000 |
| Larger project (126 m²) | £126,000–£252,000 |
| Rate per m² | £1,000–£2,000 |
Your quote will depend mainly on:
- Whether you live in during the work
- Structural and damp repairs
- Windows and doors
- Extent of rewiring and replumbing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Ashford, Kent?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Kitchens and bathrooms
- Joinery, doors and floors
- Decoration
- Building control for notifiable work
- Structural repairs and damp treatment
- Plastering and boarding
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Ashford, Kent
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
From TN24 outwards, we take on projects throughout Ashford and the surrounding parts of Kent.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Ashford, Kent
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How much does a house renovation cost in Ashford?
In Ashford, a house renovation typically costs £1,000–£2,000 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £90,000–£180,000. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How long does a house renovation take in Ashford?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.