What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Ashford, Kent?
In Ashford, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £236,000–£378,000 |
| Typical project (150 m²) | £337,500–£540,000 |
| Larger project (210 m²) | £472,500–£756,000 |
| Rate per m² | £2,250–£3,600 |
The biggest cost drivers are:
- Ground conditions and foundations
- Size and complexity of the house
- Services connections
- External works and landscaping
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a new build home in Ashford, Kent?
Before anything is built in Ashford, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a new build home:
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Structural and services design
- Mechanical and electrical installation
- Groundworks, foundations and drainage
- Site appraisal and feasibility
How long does it take?
Expect 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Ashford, Kent
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
If your home is in Ashford or close by in Faversham, Canterbury and Folkestone, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Ashford, Kent
Who approves a new build home in Ashford?
Planning matters in Ashford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How much does a new build home cost in Ashford?
In Ashford, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.