What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Basildon?
In Basildon, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £85,500–£171,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Basildon. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £60,000–£119,500 |
| Typical project (90 m²) | £85,500–£171,000 |
| Larger project (126 m²) | £119,500–£239,500 |
| Rate per m² | £950–£1,900 |
Your quote will depend mainly on:
- Structural and damp repairs
- Kitchens and bathrooms
- Finishes
- Windows and doors
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Basildon?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Rewiring and heating upgrades
- Building control for notifiable work
- Kitchens and bathrooms
- Structural repairs and damp treatment
- Condition survey and scope of works
- Plastering and boarding
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Basildon
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
If your home is in Basildon or close by in Pitsea, Stanford-le-Hope and Wickford, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Basildon
How much does a house renovation cost in Basildon?
In Basildon, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £85,500–£171,000. Your fixed price depends on the survey and drawings.
Who approves a house renovation in Basildon?
Planning matters in Basildon go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
