What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Pitsea?
In Pitsea, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £85,500–£171,000. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £60,000–£119,500 |
| Typical project (90 m²) | £85,500–£171,000 |
| Larger project (126 m²) | £119,500–£239,500 |
| Rate per m² | £950–£1,900 |
What moves the price most:
- Whether you live in during the work
- Structural and damp repairs
- Windows and doors
- Finishes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Pitsea?
Approvals for a house renovation in Pitsea follow the rules for England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Rewiring and heating upgrades
- Joinery, doors and floors
- Building control for notifiable work
- Plastering and boarding
- Condition survey and scope of works
- Structural repairs and damp treatment
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Pitsea
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
We work across Pitsea and neighbouring areas such as Basildon, South Benfleet and Wickford. Postcodes we cover in Pitsea include SS13.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Pitsea
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
How much does a house renovation cost in Pitsea?
In Pitsea, a house renovation typically costs £950–£1,900 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £85,500–£171,000. Your fixed price depends on the survey and drawings.
Who approves a house renovation in Pitsea?
Planning matters in Pitsea go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
