SK Developments Free home visit0800 088 6248 Get a quote

DorsetHouse renovations

House renovations in Christchurch

Thinking about a house renovation in Christchurch? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Christchurch

£900–£1,850 per m² for a medium to full renovation

In Christchurch, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a house renovation?

Renovated Victorian living room with a restored fireplace, sash windows and pine floorboards

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.

How much does a house renovation cost in Christchurch?

In Christchurch, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500. Prices in the South West sit near the national average for this kind of work, and the range for Christchurch reflects that. Design, structural calculations and council fees are extra.

Guide prices for Christchurch, including VAT at 20% (5% may apply to homes empty for two years or more)
Size or typeGuide range
Smaller project (63 m²)£56,500–£116,500
Typical project (90 m²)£81,000–£166,500
Larger project (126 m²)£113,500–£233,000
Rate per m²£900–£1,850

Your quote will depend mainly on:

  • Windows and doors
  • Extent of rewiring and replumbing
  • Kitchens and bathrooms
  • Structural and damp repairs

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a house renovation in Christchurch?

Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most house renovations:

  • Joinery, doors and floors
  • Building control for notifiable work
  • Kitchens and bathrooms
  • Structural repairs and damp treatment
  • Plastering and boarding
  • Rewiring and heating upgrades

How long does it take?

Build time is typically 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Christchurch

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

From BH23 outwards, we take on projects throughout Christchurch and the surrounding parts of Dorset.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about house renovations in Christchurch

Do I need planning permission to renovate?

Internal work usually does not need planning permission unless the house is listed. External changes may.

How long does a full renovation take?

Typically 8 to 20 weeks on site depending on the size of the house and scope.

Do you build house renovations in Christchurch?

Yes. We build house renovations across Christchurch, including postcodes BH23. Every project starts with a free home visit.

Does a renovation need building regulations approval?

Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.

How much does a house renovation cost in Christchurch?

In Christchurch, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £81,000–£166,500. Your fixed price depends on the survey and drawings.

Ready to talk about a house renovation in Christchurch? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price