What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Clevedon?
In Clevedon, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500. Building costs in the South West are close to the UK average, so the figures for Clevedon are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £56,500–£116,500 |
| Typical project (90 m²) | £81,000–£166,500 |
| Larger project (126 m²) | £113,500–£233,000 |
| Rate per m² | £900–£1,850 |
What moves the price most:
- Kitchens and bathrooms
- Finishes
- Whether you live in during the work
- Structural and damp repairs
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a house renovation in Clevedon?
The approval route for Clevedon is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Building control for notifiable work
- Plastering and boarding
- Decoration
- Rewiring and heating upgrades
- Condition survey and scope of works
- Structural repairs and damp treatment
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Clevedon
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
If your home is in Clevedon or close by in Nailsea, Portishead and Weston-super-Mare, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Clevedon
Do you build house renovations in Clevedon?
Yes. We build house renovations across Clevedon, including postcodes BS21. Every project starts with a free home visit.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
How much does a house renovation cost in Clevedon?
In Clevedon, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £81,000–£166,500. Your fixed price depends on the survey and drawings.
