What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Weston-super-Mare?
In Weston-super-Mare, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500. Prices in the South West sit near the national average for this kind of work, and the range for Weston-super-Mare reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £56,500–£116,500 |
| Typical project (90 m²) | £81,000–£166,500 |
| Larger project (126 m²) | £113,500–£233,000 |
| Rate per m² | £900–£1,850 |
Your quote will depend mainly on:
- Whether you live in during the work
- Extent of rewiring and replumbing
- Finishes
- Structural and damp repairs
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Weston-super-Mare?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a house renovation:
- Building control for notifiable work
- Plastering and boarding
- Rewiring and heating upgrades
- Structural repairs and damp treatment
- Joinery, doors and floors
- Decoration
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Weston-super-Mare
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
If your home is in Weston-super-Mare or close by in Burnham-on-Sea, Clevedon and Nailsea, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Weston-super-Mare
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Do you build house renovations in Weston-super-Mare?
Yes. We build house renovations across Weston-super-Mare, including postcodes BS23. Every project starts with a free home visit.
How much does a house renovation cost in Weston-super-Mare?
In Weston-super-Mare, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £81,000–£166,500. Your fixed price depends on the survey and drawings.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.