What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Croydon?
In Croydon, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £72,500–£148,000 |
| Typical project (90 m²) | £103,500–£211,500 |
| Larger project (126 m²) | £145,000–£296,000 |
| Rate per m² | £1,150–£2,350 |
The biggest cost drivers are:
- Finishes
- Windows and doors
- Extent of rewiring and replumbing
- Whether you live in during the work
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Croydon?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Building control for notifiable work
- Rewiring and heating upgrades
- Plastering and boarding
- Joinery, doors and floors
- Kitchens and bathrooms
- Structural repairs and damp treatment
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Croydon
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
From CR0 outwards, we take on projects throughout Croydon and the surrounding parts of Greater London.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Croydon
How long does a house renovation take in Croydon?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a house renovation cost in Croydon?
In Croydon, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.