What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Greater London?
In Greater London, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £72,500–£148,000 |
| Typical project (90 m²) | £103,500–£211,500 |
| Larger project (126 m²) | £145,000–£296,000 |
| Rate per m² | £1,150–£2,350 |
The biggest cost drivers are:
- Whether you live in during the work
- Finishes
- Extent of rewiring and replumbing
- Windows and doors
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Greater London?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical house renovation we handle:
- Rewiring and heating upgrades
- Decoration
- Joinery, doors and floors
- Building control for notifiable work
- Plastering and boarding
- Kitchens and bathrooms
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Greater London
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Places we cover in Greater London include Acton, Balham, Barking, Barnes, Barnet and Battersea.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in Greater London
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
How much does a house renovation cost in Greater London?
In Greater London, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How long does a house renovation take in Greater London?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.