What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Ealing?
In Ealing, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. The guide for Ealing reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £72,500–£148,000 |
| Typical project (90 m²) | £103,500–£211,500 |
| Larger project (126 m²) | £145,000–£296,000 |
| Rate per m² | £1,150–£2,350 |
The main things that change the cost:
- Kitchens and bathrooms
- Finishes
- Windows and doors
- Whether you live in during the work
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a house renovation in Ealing?
The approval route for Ealing is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Condition survey and scope of works
- Building control for notifiable work
- Rewiring and heating upgrades
- Joinery, doors and floors
- Structural repairs and damp treatment
- Kitchens and bathrooms
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Ealing
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
If your home is in Ealing or close by in Southall, Greenford and Hayes, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Ealing
How much does a house renovation cost in Ealing?
In Ealing, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
How long does a house renovation take in Ealing?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.