What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in the East Riding of Yorkshire?
In the East Riding of Yorkshire, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£148,500. Building costs in Yorkshire and the Humber run about 7% below the UK average, and the figures for the East Riding of Yorkshire are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£104,000 |
| Typical project (90 m²) | £76,500–£148,500 |
| Larger project (126 m²) | £107,000–£208,000 |
| Rate per m² | £850–£1,650 |
The main things that change the cost:
- Kitchens and bathrooms
- Windows and doors
- Extent of rewiring and replumbing
- Structural and damp repairs
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a house renovation in the East Riding of Yorkshire?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a house renovation:
- Joinery, doors and floors
- Plastering and boarding
- Structural repairs and damp treatment
- Rewiring and heating upgrades
- Decoration
- Kitchens and bathrooms
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in the East Riding of Yorkshire
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Towns we cover in the East Riding of Yorkshire include Hull, Bridlington, Beverley, Goole and Brough.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in the East Riding of Yorkshire
How much does a house renovation cost in the East Riding of Yorkshire?
In the East Riding of Yorkshire, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£148,500. Your fixed price depends on the survey and drawings.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Who approves a house renovation in the East Riding of Yorkshire?
Planning matters in the East Riding of Yorkshire go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
