What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Long Eaton?
In Long Eaton, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. The guide for Long Eaton reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£107,000 |
| Typical project (90 m²) | £76,500–£153,000 |
| Larger project (126 m²) | £107,000–£214,000 |
| Rate per m² | £850–£1,700 |
The main things that change the cost:
- Kitchens and bathrooms
- Structural and damp repairs
- Extent of rewiring and replumbing
- Windows and doors
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Long Eaton?
Before anything is built in Long Eaton, we confirm which approvals apply in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most house renovations:
- Structural repairs and damp treatment
- Plastering and boarding
- Joinery, doors and floors
- Condition survey and scope of works
- Kitchens and bathrooms
- Decoration
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Long Eaton
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
If your home is in Long Eaton or close by in Ilkeston, Nottingham and West Bridgford, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Long Eaton
How much does a house renovation cost in Long Eaton?
In Long Eaton, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How long does a house renovation take in Long Eaton?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.